What's New?
Alterations
The church kitchen has been rebuilt.
Toilets for use by disabled people have
been provided.
A new ramped entrance
to the main door of the church has been constructed.
The church is wheelchair accessible and places for wheelchairs have been
created within it.
Structures for holding hanging baskets have been erected.A new eletronic organ has been installed.
Further alterations are being explored.
Phase One of these alterations is complete and includes:
(1) a lift to allow access to the Hall for disabled persons,
(2) removal of the old organ and opening up the west gallery,
(3) complete redecoration of the Church sanctuary.
|